How long does Carbon fiber strip installation take?
In most cases, the installation of Carbon Fiber is generally completed within a single day, with the exact duration contingent upon the condition of the wall being treated. This efficient process ensures minimal disruption to your schedule and living space, expediting the reinforcement of your foundation walls.

Our Locations
Fayetteville Location
3400 Walsh Pky, Suite 220
Fayetteville, NC 28311
Greensboro Location
611 Summit Ave, Suite 5
Greensboro, NC 27405
North Raleigh
208 Millbrook Rd. Suite C
Raleigh, NC 27609
Raleigh / Durham / Chapel Hill Location
8005 Knightdale Blvd
Knightdale, NC 27545
Wilmington Location
2155 Enterprise Dr. NE
Leland, NC 28451
Winston - Salem / High Point Location
2910 Griffith Rd
Winston-Salem, NC 27103
