How soon can I drive on the newly leveled driveway?
Thick and heavy material used in traditional methods like mudjacking and repouring can take several days to fully cure, rendering your driveway inoperable. However, polyurethane foam injections require much less time to harden, typically only about 30 minutes. This method minimizes downtime, so you’ll be able to use your driveway on the same day as the installation.

Our Locations
Fayetteville Location
3400 Walsh Pky, Suite 220
Fayetteville, NC 28311
Greensboro Location
611 Summit Ave, Suite 5
Greensboro, NC 27405
North Raleigh
208 Millbrook Rd. Suite C
Raleigh, NC 27609
Raleigh / Durham / Chapel Hill Location
8005 Knightdale Blvd
Knightdale, NC 27545
Wilmington Location
2155 Enterprise Dr. NE
Leland, NC 28451
Winston - Salem / High Point Location
2910 Griffith Rd
Winston-Salem, NC 27103
