Skip to Main Content
3D animation of a healthy home.

How soon can I drive on the newly leveled driveway?

Thick and heavy material used in traditional methods like mudjacking and repouring can take several days to fully cure, rendering your driveway inoperable. However, polyurethane foam injections require much less time to harden, typically only about 30 minutes. This method minimizes downtime, so you’ll be able to use your driveway on the same day as the installation. 

TarHeel Basement Systems Service Map

Our Locations

Fayetteville Location

3400 Walsh Pky, Suite 220
Fayetteville, NC 28311

Greensboro Location

611 Summit Ave, Suite 5
Greensboro, NC 27405

North Raleigh

208 Millbrook Rd. Suite C
Raleigh, NC 27609

Raleigh / Durham / Chapel Hill Location

8005 Knightdale Blvd
Knightdale, NC 27545

Wilmington Location

2155 Enterprise Dr. NE
Leland, NC 28451

Winston - Salem / High Point Location

2910 Griffith Rd
Winston-Salem, NC 27103